Cabling Factors and Tools Discussion When performing cable installations there are three factors that need to be considered, fire protection, water intrusion or flood protection, or changes in the structural foundation in your home. The two most important considerations to take into account when either pre-wiring a house or wiring after the house is complete, are the routing of the cable and the quality of the wire used. These two points are often overlooked and the decision to wire the house at all often comes as an afterthought, when most if not all of the interior of the structure has been completed.
Pre-wiring your house, or installing the wire in the stage of construction just before the drywall goes on, is always the preferred method and offers the most flexibility in placement of outlets and the routing of your cable .When deciding on the location of your outlets, try to visualize where you'll eventually be placing the furniture in the room in relation to the location of your television. Internet services are also being provided now by a lot of cable companies so placing an outlet in a spot near your planned computer station is also a good idea .In general it's a good idea to put at least one outlet in every room whether or not you plan to use it immediately. At least it will be there when it is needed, avoiding the drilling of any unsightly holes in the future.
Outlet boxes can be purchased at any hardware store and should be fastened to the wall stud in the location that you want at the same height as existing electrical outlets. It is recommended to install the outlet box in the adjacent wall stud cavity. Any wiring system should have a suitable ground and wiring for your cable TV needs is no exception. When planning your wiring layout always take the point of grounding under initial consideration. This is where most cable companies prefer to enter your house with their service and is where all wires leading to various outlets throughout the house should originate.... point of origin. This is almost invariably where the main power service enters the residence.
The most popular method of prewiring your house is called the "home run method" in which each run of wire for each outlet is ran separate back to the point of origin. This type of wiring is preferred for ease of troubleshooting in case of any problem. Also in the future possibility of apartments etc., separation and security of services are more easily maintained. This method of wiring also ensures obtaining the least amount of signal attenuation for each run of cable. So now that you have your wiring route all planned out it's time to drill your holes in the floor and joists.
This assumes, of course, you have an open basement or crawl space to work in. Otherwise you may have to look at routing your wiring up through the walls, across the attic and down by your electrical panel. Drill a hole big enough to accommodate your cable directly below your outlet boxes and a hole either 1/2 inch or 3/4 through all the joists in the planned route. This helps to maintain the structural integrity of the floor joists. Try placing your reel or box of cable at the point of origin and pulling your cables through the holes to the various outlet boxes one wire per outlet. Care should be taken not to pull too hard on the wire or to try and fit too many wires through the same hole. Hauling a couple wires through each 1/2 inch hole is plenty and for more wires you should use the 3/4 inch size hole. Another technique used by some is to loop the outlets in each room to each other creating one continuous run back to the point of origin. Although this may seem convenient on the surface, in the long run it is much more susceptible to troubleshooting problems and unnecessary degradation in signal loss may be experienced. It is very important when installing the cable to not bend it too tightly around corners or squat it unnecessarily when fastening it. Any considerable change in the physical characteristics of the cable will almost certainly result in a degradation of its performance.
Once it is installed and the dry wall is up it will be very difficult to repair any damage. Never haul your wires through the same holes as electrical wires. If you are fastening your wires to the bottom of the floor joists, try using tower clips instead of staples. They hold just as good and there is less chance of squatting or puncturing the cable. Remember to mark your wires according to the rooms they are going for ease of identification after the house is complete. Leave a few inches of wire coiled up in the outlet boxes and a couple feet of slack to work with at the point of origin and you are pretty well done.
Wall plates and connection of the cable are most times provided by the cable company when the cable service itself is installed. If you are not ready to have the service installed yet or you are installing a satellite dish then you should be able to purchase wall plates and connectors at your local hardware store. If the house you just bought isn't pre-wired for cable and has a completely finished basement, then your only option, besides fishing wires up through the walls, may be drilling through the wall to the outside and routing your cable on the exterior of your house. If you are getting cable TV service installed by your local cable company then this type of job is best left to them as they are the professionals and have the experience and materials to do the job properly.…...

Similar Documents

Free Essay

Lab9 Cabling

...required network cabling, termination points/boxes and necessary network devices. Mating sleeves, bare fiber adapters and optical attenuators are a few things that are needed specifically for fiber installation. In addition, the purpose would also include the proper details and criteria for the successful design of the network system. The contractor shall provide all of the necessary cables, network equipment and components necessary to construct the network system. This includes all raw materials such as cable, wall plates, outlet boxes, and such terminating modules and components as necessary to complete the job as contracted. Devices like test kits, power meters, fault locators, and connector adapters are all pre purchased and is property of the installing company. This document provides all of the necessary specifications to be used in the design of the network infrastructure and associated equipment. The contractor shall furnish all labor, materials, tools, equipment and reasonable incidental services necessary to complete an acceptable installation of the network infrastructure as contracted. Business Case Your network will be FTTB (Fiber to the Building). This means that the fiber will run to the main building and that will give you the ability to use fiber throughout the entire complex or the use of high-bandwidth copper cabling can be used. For the wired portion of the building and the telecommunications room, we will be using 62.5/125 cabling. Each room......

Words: 1246 - Pages: 5

Premium Essay

Health Policy & Social Factors Discussion

...Grade Received - "A" Discuss the impact of health policies on the social factors that help determine health. Medical care funding and provisions would come to mind when one would think about health policies. What could be avoided back then were the social conclusiveness of health, but this has changed since then. There are a few impacts that health policies have on social factors. We all know that medical care can lengthen the time the survival under adverse or unusual circumstances and also improve the outcome of serious diseases, but more importantly the health of a given population as a whole can be economic and social requisite state that makes individuals have unsatisfactory health and need medical care to begin with. However, access to healthcare that is acceptable everywhere is definitely one of the social determinants of an individual’s health. Health policies definitely have an impact on social factors and play a significant role in the end results of diseases in the beginning of an individual’s childhood. Health policies also has an astounding effect when it comes to working conditions, poverty, narcotics, unemployment, what we consume, and etc. From a historical standpoint, health policies playing important role on not only an individual’s position in society, but also a population or gross position in society and how they may participate in a civic society. This is because health policies can have social and psychological influences that can affect the......

Words: 360 - Pages: 2

Free Essay

Unit 5 Assignment 1 Cabling Factors and Tolls Discussion

...Unit 5 Assignment 1 Cabling Factors and Tolls Discussion Flexibility What type of install is the cable going into? Is everything in a fixed position? If you have an install where items are moved around without being disconnected, using highly flexible cable is necessary. Cables in these scenarios need to be flexible to meet those demands of mobility, and also for the life of the wire so that it does not crack, break, fray or short. We had a job at a university where we moved flat panels on a track system to create different screen sizes, and for that we had to make sure the cable would meet the demand. Capacitance Cat 6 is not always better than Cat 5. If a video extender is made for Cat 5e, using Cat 6 may cause you a problem. The electrical properties are different, and the circuitry inside may not be able to reconcile the increased capacitance. You should confirm with the manufacturer before making a substitute in a Category cable. Jacket What type of jacket does your cable need? You have plenum, riser, PVC/non-plenum and direct burial. Plenum cable is often required in commercial work, especially in buildings where there are open-air returns; it is essential to meeting code. Integrators will often use riser grade at the riser, and then transfer to plenum in the plenum space. This saves some cost, but I recommend you second-guess saving that few cents per foot in most cases. The chances of mixing up a box of cable and pulling riser in the plenum space may......

Words: 318 - Pages: 2

Free Essay

Cabling

...What industry standards body and standards series numbers do you need to reference for Ethernet applications and cabling? a. The Commercial Building Telecommunications Cabling Standard, known as ANSI/TIA/EIA-568-C. b. The IEEE maintains the industry standards for Ethernet protocols, which is part of the 802.3 series of standards. There is an increased need for speed these days and network technology designers are planning to support data rates of up to 100Gbps. 2. What are the different types of Category 6 cable and what should be recommended for this network? a. 10Gbps @ 100 Meters – There are two types of Category 6 cable, regular Category 6, and Category 6A (or Augmented Category 6). It would be my recommendation to use 6A or Category 7. Since we have to support 10Gbps over a maximum of 100 meters, I would recommend using Category 6A, or Category 7 cabling. 3. What cable would you recommend to offer the best shielding performance? a. Full of stray EMI, UTP not an option, and customer wants to ensure capability to operate at 10GBase-T. i. I could recommend a Screened Twisted-Pair Cable or Screened Shielded Twisted-Pair Cable. 4. What type of cable would you use for a. Horizontal Spaces – Plenum cables. Solid Conductor Wire. b. Vertical Spaces – You should use riser-rated cabling in vertical spaces or where flexibility is important. Stranded-conductor wire. 5. What would you look for in trying to find fault if you had the following failures: a. NEXT and......

Words: 341 - Pages: 2

Free Essay

Unit 5 Cabling Factors

...4/14/2014 Unit 5. Assignment 1: Cabling Factors and Tools Discussion Three factors that need to be considered is being fire protected, water proof, and shock protection. Being fire protected, just in case a fire occurs, the wiring would be protected by a casing around the actual wires which in cause wouldn’t melt the casing and destroy the wires. Since the data room is usually in the basement of companies, if a flood occurs, there are wires that are protected by a casing that would not let water intrude into the casing. For shock protection, there is always a chance for a shortage to happen. Wiring and a lot of electricity used. For example, if there is a storm going on and lightning hits a generator and shorts everything out, it would not fry the wiring if they are protected from the shock. The two most important considerations to take into account when either pre-wiring a house or wiring after the house is complete, are the routing of the cable and the quality of the wire used. These two points are often overlooked and the decision to wire the house at all often comes as an afterthought, when most if not all of the interior of the structure has been completed. Some tools that would be useful to use are cable cutters, hole cutting tools, wire strippers, punch down tools, RJ45 connector crimp kits, pliers and cutters, label makers and electrical tape. The makeshift tool that we would use is a staple gun....

Words: 256 - Pages: 2

Premium Essay

Cabling

...applications and cabling? A # 1) The IEEE sustains the industry standards for Ethernet applications and cabling. This is a segment of the 802.3 series of standards and includes applications such as 1000Base-T, 1000Base-SX, 10GBase-T, 10GBase-SR. I found the answer on page 8 in Cabling: The Complete Guide to Copper and Fiber-Optic Networking 4th Edition book. Q # 2) What are the different types of Category 6 cable and what should be recommended for this network? A # 2) Only two different types of 6 cables Category 6, 250 MHZ and Category 6A, 500 MHZ. I would recommend for this network the Category 6A because it has a higher MHZ and as well the network intended to use 10 GB Ethernet with a bandwidth support of 500 MHZ is better than 250MHZ support. The reason I recommend this because of the information on page 8, 12, 17, and 35 in the Cabling: The Complete Guide To Copper and Fiber-Optic networking 4th Edition Book. Q # 3) What Cable would you recommend to offer the best shielding performance? A # 3) I would recommend the S/STP cabling, also known as screened fully shielded twisted – pair (S/FTP), Contains four individually shielded pairs of 24,AWG, 100 ohm wire surrounded by outer metal shielding covering the entire group of shielded copper pairs. This type of cabling offers the best protection from interference from external sources, and also eliminates alien crosstalk, allowing the greatest potential for higher speeds. Sited from page 14 from Cabling: The Complete......

Words: 675 - Pages: 3

Free Essay

Cabling Factor

...there is certain factors which need to be addressed prior to starting your design. Planning is one of the most important aspects or a proper design for your installation. Deciding where your cables are going to be ran what equipment you’re going to need to set up the network system. What tools you’re going to need to achieve the desired outcome and materials. Also, making sure the area you are going to be installing in is up to NFPA, FCC, UL, NEC code. Verifying that a system is safe from harming any occupants that may inhabit the structure is key to quality and control. Also if your equipment is safe and of good quality not only will your system be safe but also run better. If you have wires hanging out, shorts in networking hardware, systems that run too hot and placed in tight areas with no ventilation just some examples. Some aspects of proper design are having a detailed plan of how the installation will proceed, you should know the scope of the project, and i.e.…how many cable runs you have what connections need to be made. Your design should also be made available to all people involved with the installation. As well as contain a blueprint of how the cables will be installed. Tools that will be useful in your installation will be, Wire cutters, crimpers, pen and paper, fish tape, pull string, two way radio, labeling materials, punch down tool, toning tools, basic hand tools. I know I have used off the book tools to install cabling. One of the tools I used and it......

Words: 355 - Pages: 2

Free Essay

Cabling Factors

...Clarence Gilchrest 10/06/2014 EN1320 Introduction Over ten years ago, I claimed victory at graduation vowing to never enter a classroom again. Didn’t take long for another battle to begin without my awareness, forcing me to break my vow. It was probably a foolish vow to begin with anyway. But even after doing so, starting school again, I didn’t get very far. So what was all that for? Why did I go through that to make a noble decision only just to fail? I consider myself as a late bloomer, though I was given a heads-up on the new world I was entering, I still didn’t get until I was in it. Getting as much advice from wiser people as possible still didn’t give me enough common sense to go out and follow that advice given. Whoever had that problem? How were you able to break it? Now I’m back at that same decision I made all those years ago, and I feel so much different from before. What happened? What changed? What gave me this confidence and courage repeat what I failed in the past? Everyone experiences life similarly but differently. This introduction only will attract those who may have had the same thought process as my own. This is a reflection of personal issues with oneself, and who is willing to break these weaknesses by any means. This is not a guideline for I can’t tell anyone how run their life. This is for you to take a pencil and paper and write down any relevant notes that you feel may help you in your process of becoming a stronger person. This is only......

Words: 286 - Pages: 2

Free Essay

Cable Factors and Tools

...to move them around. You should never use tape unless it’s just for the initial installation then place your zip ties. You need to ensure that your cables all meet the fire resistance rating throughout the network. Now I will talk about the right tools that are needed to install your network. The following tools are what you need for all cable installation: fish tape, wire-strippers, cable splicing tools, cable cutters, scissors, zip ties, measuring tape, marker, crimping pliers, voltage meters, and a cable tester. The following tools are ones you can purchase and use every day. Some people use a knife but you don’t want to because you could ruin the cable by trying to strip it. After using the internet I found a homemade wooden coax compression fitting tool. This will save you money from buying an expensive one and works. This tool allows you to but the tips on the end of your coax cables. References Greenish Apple. (2014, October 19). Homemade Wooden Coax Compression Fitting Tool. Retrieved from instructables: http://www.instructables.com/id/Homemade-Wooden-Coax-Compression-Fitting-Tool/ Solid Signal. (2014, October 19). Cable Kits. Retrieved from Solid Signal: http://www.solidsignal.com/cview.asp?mc=09&d=installation-tools&c=DIY%20Cable%20Kits...

Words: 400 - Pages: 2

Free Essay

Cabling

...The IEEE (Institute of Electrical and Electronics Engineers) maintains the industry standards for Ethernet protocols. The 802.3 series includes Ethernet applications and cabling. The different types of category 6 cable includes CAT6, CAT6A, and CAT6E, although 6E is not an industry recognized standard. I would recommend CAT6A for the possible 10GBASE-T upgrade in the future because it has improved alien crosstalk characteristics when compared to regular CAT6. Unless you decided to go with fiber, you should use STP CAT 6a or CAT7 for a 10gbase-t network, although there were quite a few articles online arguing that shielded cable is unnecessary after going to cat6a or 7 due to higher frequencies that these cable can utilize. The horizontal spaces should use fire retardant plenum cable since it is also used for HVAC. While it might also be prudent to use fire retardant riser cabling for the vertical shafts as well, however if fire stops are placed in the risers you could get away with using regular UTP as well in some places if cost was an issue. The NEXT and FEXT problems could have something to do with having a cable with too many twists, with NEXT the problem would be at the end of the cable where the signal originates, and with FEXT it would be at the opposite end. As the signal rate increases alien crosstalk become more and more of an issue. If it is too much of an issue your best bet might be to upgrade to fiber....

Words: 255 - Pages: 2

Free Essay

Nt1310/Cabling Definitions

...Annette Cattron Mr. Quwaider/NT1310 February 12, 2015 Cabling Definitions 1. Horizontal Cable= The portion of telecommunications cabling that provides connectivity between the horizontal cross-connect and the work-area telecommunications outlet. The horizontal cabling consists of Transmission media, the outlet, the terminations of the horizontal cables, and horizontal cross-connect. 2. Backbone Cable = is the inter-building and intra-building cable connections in structured cabling between entrance facilities, equipment rooms and telecommunications closets. Backbone cabling consists of the transmission media, main and intermediate cross-connects and terminations at these locations. 3. Patch Cords = A patch cord (sometimes called a patch cable) is a length of cable with connectors on the ends that is used to connect an end device to something else, such as a power source. One of the most common uses is connecting a laptop, desktop or other end device to a wall outlet. 4. Connectors = Connector may refer to: Electrical connector, a device for joining electrical circuits together. Audio and video connector, electrical connectors 5. Conduit = a pipe, tube, or tile for protecting electric wires or cables. a means of transmitting or distributing 6. Racks = A computer rack (commonly called a rack) is a metal frame used to hold various hardware devices such as servers, hard disk drives, modems 7. Punch-Down Blocks = A type of terminal strip used to connect telephone...

Words: 851 - Pages: 4

Premium Essay

D. Discuss the Factors That Influence Indigenous Mortality. Include the Following in Your Discussion:

...required for the question. For example, Question 1: a. minimum 100 words b. minimum 100 words Please use APA referencing to acknowledge your sources of information: APA Referencing Guide (located under ‘Tools’ in the HLTHIR403C_HLTHIR404D unit on my.tafe). Question 1 Using the latest Australian Bureau of Statistics data answer the following questions: a. Using current statistical information, discuss the inequality between Indigenous and non-Indigenous mortality rates in Australia b. Discuss the factors that influence Indigenous mortality. Include the following in your discussion: * social determinants that impact on Indigenous health * historical and cultural influences such as ‘stolen generation’, self determination Question 2 a. Discuss effective communication strategies a nurse would use in a client admission interview. In your answer, consider effective verbal and non-verbal communication and the use of empathy. the sender then communicates to a receiver verbally, nonverbally, or in some other symbolic form (e.g., art). Verbal and nonverbal messages, as well as the influence of cognitive factors on communication, are b. Time is an increasingly challenging aspect of the nurseclient relationship. influential factors includes perception, cultural context, space and distance, and time Perception is an individual’s subjective sense of the world around him. “Rather than hear a story, we construct a story about what......

Words: 1773 - Pages: 8

Premium Essay

Factors Affecting Job Evaluation as a Tool for Total Reward Adminitsration

...endeavor concerned with the establishment and implementation of sound policies and method of employee compensation,(Bates, 2004). It includes areas like job evaluation, development and maintenance of wage structures, wage surveys and wage adjustment. Beach (2004) postulates that job evaluation is a formalized system for determining the relative money value of jobs for the purpose of writing job description and specification, rating of these jobs through use of job values to definite wage rates. Job evaluation has rendered a futile exercise by the developments in Zimbabwe towards compensation administration. In Zimbabwe the adoption of job evaluation program by industrial concern increases and become a wide spread in the modern organizations. Factors inducing companies to adopt wage rationalization programs were the rise of the trade unions in Zimbabwe. Labour unions and the recognition by management of the need for orderly logical means for establishment of of wage rates, (Tracy, 2008). Management has learned that it must have some means for explaining how it has arrived at wage rate decision when it is negotiating with unions. In Zimbabwe trade unions wish very well to know how wages of employees are being calculated during their negations with the management of the organization. The management should know how the wage rate is being derived or calculated and should able to explain how they come upwith the wages for their employees inorder to convince the labour unions,......

Words: 961 - Pages: 4

Free Essay

Cabling Standards

...INTRODUCTION TO STRUCTURED CABLING Compiled by Sonam Dukda Division of Information Technology Ministry of Communication September 2000 TABLE OF CONTENTS 1 2 INTRODUCTION .......................................................................................................................... 4 NETWORKING ............................................................................................................................. 5 2.1 Objectives ................................................................................................................................ 5 2.2 Choice of Software and Hardware........................................................................................... 5 3 NETWORKING TRENDS ............................................................................................................. 6 4 STANDARDS................................................................................................................................. 6 4.1 International Standards ............................................................................................................ 6 4.2 Industry Standards. .................................................................................................................. 6 4.3 Structured Cabling standards................................................................................................... 6 4.4 Highlights of the EIA/TIA-568A standards.................................................

Words: 5055 - Pages: 21

Free Essay

Tools

...power & hand tools Toolsmarket : A consumer’s What’s the colour and shape of the power and hand tools category moving into 2012? Nick walsh reports on a consumer-friendly market. “It’s hard work. Everyone’s fighting but that’s the nature of the economy. Those that are working smarter are thinking about how they deliver products to the market and they are the ones that are winning.’ says Blair Sutherland, National Sales Manager for Fox & Gunn. It’s a synopsis we’ve heard time and time before over the last 12 months but one that still rings true. No one is saying it’s an easy market, but according to Sutherland: “Everyone is very optimistic about this year and the signs are good. Building hand tool products have definitely lifted. That in itself says to us that the market is starting to make spasmodic recovery. It’s just a question of when and how it’s going to happen.” Across the board, there is a palpable sense of a “waiting game” going on, especially in light of the inherent role new construction starts play in the industry. As we go to print, building consent figures for January do show positive growth and though it does come as heartening news, many players in the market are wisely sceptical about anything suggesting less than steady incremental progress. But you do have to be in to win and suppliers are prepared for an expected increase in demand. In the notoriously price-feisty power tools sector we hear that demand is currently at a low point but suppliers are......

Words: 4595 - Pages: 19

Перейти к комментариям | Marvel’s Luke Cage | Scarica APK