How to Develop Work Breakdown Structures

Michael D. Taylor

2

Copyright  2003-2009 by Michael D. Taylor All Rights Reserved. No part of this work covered by the copyright hereon may be reproduced or used in any form or by any means -- graphic, electronic, or mechanical, including photocopying, recording, taping, or information storage and retrieval system -- without written permission of Michael D. Taylor, Systems Management Services (http://www.projectmgt.com).

Page |3

WORK BREAKDOWN STRUCTURES
“A Work Breakdown Structure is a deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables.” 1

A Work Breakdown Structure (WBS) is a fundamental project management technique for defining and organizing the total scope of a project, using a hierarchical tree structure. The first two levels of the WBS (the root node and Level 2) define a set of planned outcomes that collectively and exclusively represent 100% of the project scope. At each subsequent level, the children of a parent node collectively and exclusively represent 100% of the scope of their parent node.

A well-designed WBS describes planned outcomes instead of planned actions. Outcomes are the desired ends of the project, such as a product, result, or service, and can be predicted accurately. Actions, on the other hand, may be difficult to predict accurately. A well-designed WBS makes it easy to assign any project activity to one and only one terminal element of the WBS.

TYPES OF WORK BREAKDOWN STRUCTURES
Even though the term “Work Breakdown Structure” has been used as a label for all project scope hierarchical diagrams, there are, in practice, many types other than “deliverable” oriented structures.

1

A Guide to the Project Management Body of Knowledge, (Newton Square, PA:…...

Similar Documents

Premium Essay

Pm586 Huntsvill Project (Wbs)

...4 WBS |Outline Number |Task Name |Duration |Predecessors |Start |Finish |Resource Names | |1 |1 |Huntsville Plant- Project |10 wks |  |Fri 4/17/09 |Thu 6/25/09 |  | |1.1 |1.1 | PLANNING PHASE |10 wks |  |Fri 4/17/09 |Thu 6/25/09 |  | |1.1.1 |1.1.1 | Select Architect |2 wks |  |Fri 4/17/09 |Thu 4/30/09 |Facility Specalist[60%],Project Manager[10%] | |1.1.2 |1.1.2 | Recruit & Train Managers |6 wks |  |Fri 4/17/09 |Thu 5/28/09 |Project Manager[15%],Corp. Personnel[80%] | |1.1.3 |1.1.3 | Select Real Estate Consultant |2 wks |  |Fri 4/17/09 |Thu 4/30/09 |Project Manager[10%],Facility Specalist[50%] | |1.1.4 |1.1.4 | Pre-Production Plan |2 wks |  |Fri 4/17/09 |Thu 4/30/09 |Production Specialist[80%],Manufacturing Engineer[85%],Project Manager[20%] | |1.1.5 |1.1.5 | Create Production Plan |4 wks |6 |Fri 5/1/09 |Thu 5/28/09 |Production Specialist[60%],Manufacturing Engineer[80%],Marketing Specialist[20%] | |1.1.6 |1.1.6 | Building Concept |2 wks |6,3 |Fri 5/1/09 |Thu 5/14/09 |Facility Specalist[40%],Architect[70%] | |1.1.7 |1.1.7 | Building Design |6 wks |8 |Fri 5/15/09 |Thu 6/25/09 |Facility Specalist[20%],Architect[10%] | |1.1.8 |1.1.8 | Site Procurement |3 wks |5,8 |Fri 5/15/09 |Thu 6/4/09 |Real Estate Consultant[70%],Marketing Specialist[20%],Facility Specalist[30%] | |1.1.9 |1.1.9 | Select General Contractor |2 wks |8 |Fri 5/15/09 |Thu 5/28/09 |Project Manager[10%],Facility Specalist[30%],Production Specialist[10%],Architect[15%] |...

Words: 678 - Pages: 3

Premium Essay

Capstone Wbs Dictionary

...WBS Dictionary Team One Technologies Project Management | From start to finish lay out of the project | Scope / Requirements | Team One Technologies is determined to helping Greenway Bank develop an approach to examine their scale or level of risk management. | Design | The office will house a local LAN, create a revenue stream, a new inbound customer service call center | Headquarters and four branch locations | Four branches located in New York, Seattle, Orlando, and Los Angeles, corporate offices in St Louis | Budget breakdown / Materials | Total cost on parts, labor and time | Complete data network and communication to all locations | Networks connect large numbers of users to share information and resources | Physical Layout for Voice & Data | A building by building layout or diagram for the Physical layout for the voice and data network | Data storage and off site backups for all 5 locations | off-site data protection, or vaulting, is the strategy of sending critical data out of the main location (off the main site) as part of a disaster recovery plan.Example: Barracuda Networks | Network Configuration Plan | the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance, and provisioning of networked systems. | Documentation for business continuity | The activities performed by Team One Technologies to ensure that critical business functions will be available to customers, suppliers, regulators,......

Words: 655 - Pages: 3

Free Essay

Wbs Work Breakdown

...WBS University: BUS 611 Instructor: Date Work Breakdown for maintaining aboveground swimming pool Introduction The industry involved in the following work breakdown study is household recreation. The high level deliverables of the project include a single summer season of safe and healthy family fun in the water, including appropriate levels of water sanitation and safe levels of appropriate chemicals. Since the pool has already been constructed, this WBS concerns only pool maintenance. The resources required for this project are minimal and include $300 in common pool maintenance products available at home improvement and pool specialty retailers. This project requires labor equivalent to roughly three hours per week aggregated over a three-month period. Body This generic WBS was used to maintain the pool, and it was effective in organizing maintenance efforts and ensuring timely testing. A scheduling system was devised through the use of a disposable weekly checklist and countdown timer. This was marginally effective, as sometimes, workers did not strictly adhere to timetables despite the aforementioned tools. Project status reports describe the completeness of various recurring tasks and assign percent completion to these tasks. An informal status reporting system was used for pool maintenance and was effective, as workers were always informed as to whether previous work had been completed, and whether to proceed with their own assigned......

Words: 668 - Pages: 3

Free Essay

Comment Creer Un Wbs

...Comment Creer Un WBS Comment construire une structure WBS (Word Breakdown Structure) Un WBS ou structure WBS (Work Breakdown Structure) définit les objectifs d'un projet à tous ses niveaux de détail. Chaque niveau représente les composants mesurables qui doivent être fabriqués ou achevés afin d'atteindre l'objectif final, à savoir la réalisation et la livraison du produit. Le WBS a une structure hiérarchique : l'objectif situé en haut de la structure (niveau 1)représente l'ensemble du projet, alors que les niveaux inférieurs découpent le projet en composants et sous-composants de manière de plus en plus détaillée. Lors de la mise en place d'un WBS, il est important d'éviter de reproduire une structure de type organisationnelle ou fonctionnelle, dans la mesure où celles-ci ne sont pas fondées sur les résultats à atteindre. Les objectifs définis à tous les niveaux du WBS doivent au contraire représenter des résultats ou des livrables mesurables, en d'autres termes les composants du produit final à livrer au client à l'aboutissement du projet. Le WBS doit donc impérativement se limiter à définir les produits, sous-produits et services directement liés à ces résultats et livrables. La première étape de la gestion d'un projet consiste à créer le WBS. C'est en effet sur cette structure que se fonde toute la planification des processus et des échéances du projet. Ainsi, une fois le WBS mis en place, minutieusement vérifié et au besoin rectifié, il devient le document......

Words: 785 - Pages: 4

Premium Essay

Imf & Wb Affect on Africa

...This programme aims to achieve a uniform teacher-student ratio across the country and claims to achieve the following: financial sustainability; enhanced educational quality; and equity among regions and schools. The Ministry targets teacher learner ratios of 1:40 for primary schools and 1:36 for secondary schools by the year 2002. The nature of Poverty Reduction Strategy Papers (PRSPs) The PRSPs are supposed to provide more freedom to developing countries in formulating their policies. This is what the Bank and the Fund call "national ownership." Representatives from the government, the private sector, civil society organizations - and even the poor - are supposed to "participate" in drafting the PRSP of each country to decide on how to use the proceeds released by "debt relief" to achieve "poverty reduction". In reality, the macroeconomic framework that underpins the PRSPs is the same as that which underpinned the now discredited SAPs. That framework is non negotiable and includes fiscal austerity, trade and financial liberalization, privatization, deregulation and State retrenchment, etc. In essence, despite the disastrous outcome of their past policies, the IMF and the World Bank still believe that those policies are in the "interests of the poor". In particular, they think that trade liberalization and openness are the best - if not the only - road to growth, which they see as a "prerequisite" for poverty reduction. Hence the export-led growth strategy......

Words: 2395 - Pages: 10

Premium Essay

Wbs Example

...WBS Outline for Advanced Infrared Burner Technology Fryer Advanced Infrared Burner Technology Fryer 1. Project Team Selection 2.1. Establishing department Project Managers 2.2. Establishing team members with required skills 2.3. Organizing each team member into their department 2.4. Establishing a chain of command and lines of communication 2.5. Finalizing team members for the Infrared Burner Project 2. Planning and Developing 3.6. Establishing Product design 3.7. Review Product design 3.8. Patent Research 3.9. Create Patent for design 3.10. Create prototype from patent 3.11. Build prototype 3.12. Test prototype 3. Costing 4.13. Initiate Costing 4.14. Prototype Costing 4.15. Tooling/Fixture Costing 4. Service Parts Planning 5.16. Create manual with parts accessories 5.17. Establish costs for repair parts 5. Assembly Infrared Burner 6.18. Create a Blue print for the new design 6.19. Create a layout for assembling the new design 6. Design Packaging 7.20. Research packaging designs in accordance of the current market 7.21. Develop a package to hold new product 7.22. Test the package for design and function 7.23. Finalize design 7. Board Approvals 8.24. Request approval of new design 8.25. Finalize approval request 8. Field Test 9.26. Test Design of......

Words: 548 - Pages: 3

Premium Essay

Sample - Work Breakdown Structure (Wbs)

...SAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT Page 1 Printed on: January 27, 2010 Applications Development Project Sample WBS Management and support Provide project management Provide quality control Conduct meetings and reviews Materials and supplies Travel and living costs Miscellaneous costs Consulting fees and subcontractor costs Contingency Systems development Requirements specifications Conduct information-gathering sessions Prepare logical data model Prepare logical process model Physical design Prepare physical data model Prepare physical process model Online system Prepare detailed design Program and unit test Document Batch system Prepare detailed design Batch update facility Program and unit test Document Reporting system Program and unit test Document Integration Prepare integration plan System integration and test Integrate batch update and reporting system Conduct systems test on batch systems Integrate batch and online systems Conduct systems test on complete system Prepare user documentation Customer Conduct milestone reviews Review and approve deliverables Conduct user training Acceptance testing SAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT Page 2 Printed on: January 27, 2010 Prepare acceptance tests Conduct acceptance tests Prepare revisions from acceptance tests Hand over to customer Implementation Prepare implementation plan Provide support for implementation Conduct......

Words: 576 - Pages: 3

Premium Essay

Wbs (Work Breakdown Structure)

...Explain the content of a Work Breakdown Structure (WBS) and discuss its role in project management and the connection to the organisation. Work Breakdown Structure (WBS) is a tool that is used to define the work elements of a project and identify its entire scope. It is the map of the project which identifies all elements of the project and allows managers to keep track and control of it. It is made of a hierarchy which facilitates the evaluation of cost, time and performance at all levels of the project life-cycle and organization. The structure illustrates the smaller units and allows for adaptation and quick communication if there a problems which need to be addressed. Definitions of each task should be clear and avoid overlapping in assignments. Defining the project scope The scope of a project is the end result, the deliverable or project end item. This is what will be basically used for planning and measuring the project. Defining the project scope is a definition of the outcome of the projects end result. It can be a product or service or even an event. The project scope is between managers and customers it is a necessity of what has to be delivered in order to satisfy the needs from the customer’s demands. The project scope is basically to be used for planning and measuring the project. Project Scope Checklist * Project objective The project scope is to define the general obejctive goal and purpose that will meet the customers needs. E.g. (What) A......

Words: 1250 - Pages: 5

Premium Essay

Wbs and Wbs Dictionary for Wedding

...Introduction The key to a good WBS and WBS Dictionary is the engagement of project team members to comprehensively identify and discuss activities for the project. A Project Manager must ensure that all the work that needs to be accomplished for the project is contained within the WBS Dictionary and is understood by team members. All work should have clearly defined duration, resources, dependencies, and level of effort (Cleland, 1990). A Project Manager should elicit feedback from all team members to ensure that the WBS and WBS Dictionary are valid and comprehensive prior to developing the detailed schedule. The project manager, has been asked to plan the wedding for his niece. Explain why you chose to organize your WBS in the manner you did. There are three reasons why the WBS is setup in the manner it is for this wedding project. The first is that is helps more accurately and specifically define and organize the scope of the total project. The most common way this is done is by using a hierarchical tree structure. See figure 1 below for a graphical representation of the WBS. The figure shows two level due to size of the project. Appendix A contains the WBS showing all three levels in a tabular format as a requisite for this assignment. Each level of this structure breaks the project deliverables or objectives down to more specific and measurable chunks. The second reason for using a WBS in your projects is to help with assigning responsibilities, resource......

Words: 1322 - Pages: 6

Premium Essay

Wbs Dictionary

...GenRays Human Resources Information System WBS Dictionary Level WBS Code Element Name Definition 1 1 Human Resources Information System All work towards implementing an HRIS. 2 1.1 Initiation The work to initiate the project. 3 1.1.1 Evaluation & Recommendations Working group to evaluate solution sets and make recommendations. 3 1.1.2 Development of project charter Project Manager to develop the Project Charter. 3 1.1.3 Deliverable: Project charter submitted Project Charter is delivered to the Project Sponsor. 3 1.1.4 Charter is reviewed by project sponsor Project sponsor reviews the Project Charter. 3 1.1.5 Approval of project charter The Project Sponsor signs the Project Charter which authorizes the Project Manager to move to the Planning Process. 2 1.2 Planning The work for the planning process for the project. 3 1.2.1 Create project scope Project Manager creates a Preliminary Scope Statement. 3 1.2.2 Decide project team members The Project Manager determines the project team and requests the resources. 3 1.2.3 Project team first meeting The planning process is officially started with a project kickoff meeting which includes the Project Manager, Project Team and Project Sponsor (optional). 3 1.2.4 Develop project plan Under the direction of the Project Manager the team develops the project plan. 3 1.2.5 Submission of project plan Project Manager submits the project plan for approval. 3 1.2.6 Milestone: Approval of......

Words: 393 - Pages: 2

Premium Essay

Project Wbs

...____________________________________________________________________________________________________ Assessor Signature: ____________________________________________________ Table of Contents Candidate Details 2 Assessment – BSB51407 - Time 2 Competency Record to be completed by Assessor 3 Table of Contents 5 Reflections 6 Reflection: Completing the WBS 6 Reflection - Working out the Critical Path 7 Reflection - Gantt Chart Analysis 7 Figure 1 – Gantt chart 8 Record of your work experiences relating to project managing project time 9 Manage Project Time - Assessment Activities 10 Element 1 10 Assessment Activity: Time management planning 10 Assessment Activity: Resource estimation 11 Element 2 12 Assessment Activity: Network Analysis 12 Assessment Activity: Creating a Gantt chart 13 Assessment Activity: Schedule variations 14 Element 3 15 Assessment Activity: Reviewing project time management 15 Attachments 16 Project Schedule 16 Milestone Chart 16 Schedule Variance Analysis 16 Reflections Reflection: Completing the WBS Complete the WBS for planning a holiday by: a) Estimating the resources required for each activity b) Estimating the duration of each activity. c) Estimating the cost of each activity. Document your completed Work Breakdown Structure for going on a holiday in the table below. Task Number/ID | Task Description | Predecessor relationship (sequence) | Time Required | Resources |......

Words: 1504 - Pages: 7

Free Essay

Wb Anwer

...неможливо утилізувати. Що трапилось з місцевими яблуками? "Нічого", - я слабо відповів, " я віддаю перевагу тільки ківі". "Хмм. Що ж, якщо тобі прийдеться взяти їх, їж італійські, також купуй без упаковки". Він подивився на пляшки води і банки Кока-Коли. Перед тим, як він заговорить, я кажу: "Я завжди обережно відношусь до утилізації цих виробів". "Що ж, це добре, але алюміній в тих банках - погано. Вони мають добути чотири тону каменя, щоб отримати один тон алюмінію, а ціна перевозки банок та скляних пляшок дорожче, так як вони важчі від пластикових. У будь-якому випадку, що трапилось із споживанням водопровідної води? Це набагато ефективніше. "Я ...від...віддаю перевагу...". Погляд професора перебив мене з закінченням речення! " WB Task 1 p. 76 Ex. A 1. Sciencefication 2. Historicaldrama 3. Action 4. Thtiller 5. Comedt 6. Martialarts p.76 Ex. B 1. Horror 2. Special effects 3. Past 4. Predictable 5. Martial arts 6. Romantic p.76 Ex. C 1. A 2. C 3. A 4. B 5. A 6. B 7. B 8. C Listening p.76 Ex. A 1. C 2. A 3. B p.76 Ex. C 1. C 2. A 3. B 4. C 5. B 6. A p.76 Ex. D 1. T 2. F 3. F 4. T 5. T 6. F Developin conversation p.77 Ex. A 1. d 2. a 3. e 4. f 5. b 6. c p.77 Ex. B 1. What are you doing 2. Would you like 3. Is supposed 4. Really talented 5. amazing 6. Why Don’t you 7. Are......

Words: 1356 - Pages: 6

Premium Essay

Child Develope

...needed and encourages her audience to help her during her adventures. Dora The Explorer is a dynamic show that makes any child relate with her especially when they want to resolve or get out of any problem. She gives them the strength and the courage to ask for help and to be cautions. The show illustrate how a young girl spend most of the time out of her house exploring the world and solving any obstacle that she sees in front of her, by teaching Spanish- English to all the kids in the other side of the TV. Play is the most important part of the child’s development. Play allows the children to build their physical development, psychosocial development and cognitive development. At the same time Dora helps with the child motor skills like jumping, walking, and thinking. Most parents see cartoons with their children as a way to help their child learn. I have watched many children's television programs like blue's clues, and Dora the explorer, to understand how these television programs help in children and baby's development. I chose the Dora the explorer cartoon to enhance my understanding about the child development. Learning new expression from play allows children how and when to show emotions. Dora The Explorer is related with Piaget cognitive development because it makes children to think, reasoning, resolve problem and remember things with different patterns. As Dora teach in her show, kids have to be alert to memorize any pathway, find the solution of any......

Words: 1042 - Pages: 5

Premium Essay

Project Management Wbs

...Structure Paper The Work breakdown structure paper is attempting to correlate our current team project proposal into a laid out planned structure. The activities will be arranged in a chart form to help collect the necessary details to establish an increase in business for The Brand X stores.  During the planning stages of the planned structure, all of the deliverables were collected. In the beginning, we starting by applying the principles of S.M.A.R.T. (specific, measurable attainable realistic and tangible) to our information thereby making it into more manageable steps. In doing this, we created a visual definition of our project scope. Ever increasingly, the visible action helped our team and stakeholders understand how each step would lead to the successful completion of our project. "Plan Human Resource Management is the process of identifying and documenting project roles, responsibilities, required skills, reporting relationships, and creating a staffing management plan" (Project Management Institute, 2013, "Chapter 9: Project Human Resource Management").  What is Work Breakdown Structure? The structure is an effective project deliverable that helps to organize a team's work into manageable sections. The defining of work in this structure breaks down all the specific information about a project so the work will be executed correctly. The process also provides a more measured explanation of the work steps to make them more......

Words: 984 - Pages: 4

Premium Essay

Create a New Wbs Using the New Budgeting Parameters.

...------------------------------------------------- ------------------------------------------------- ------------------------------------------------- ------------------------------------------------- ------------------------------------------------- 1. Create a new WBS using the new budgeting parameters. ------------------------------------------------- With the reduction in the cost of the project due to constraints, I would have to develop a new WBS that will reflect the cost of $280.000. This means that some work packages will be eliminated to reflect the cut in budget after discussion with the stake holders. This will mean rewriting the project scope. The timeline for deliverables will be shortened. The teams will be reduced to just four and responsibilities will be added to each group to make up for the budget shortfall. The four teams will be planning, logistics, administrative and entertainment. ------------------------------------------------- Instead of having the convention for a whole weekend, this would be reduced to just two days and the agenda will be arranged to accordingly. ------------------------------------------------- ------------------------------------------------- 2. Describe how you would develop cost estimates for this project. ------------------------------------------------- Project cost management entails three aspects that may interact or be dealt with separately depending on the size and scope of the project involved. ......

Words: 638 - Pages: 3

1900.0345 | Holmes & Watson Dublado Online Assistir Holmes & Watson Dublado Online HD 720p Sherlock Holmes (Will Ferrell) e seu fiel parceiro Watson (John C.Reilly) precisam impedir o maior dos planos malignos de Moriarty (Ralph Fiennes): assassinar a rainha da Inglaterra. Ver filme Holmes & Watson Dublado HD 720p Ver Filme Holmes and Watson Dublado (2018) Assistir Filmes Online em HD Assista filmes online HD na sua tv e celular - ... | Империя Мертвецов / Shisha no Teikoku / The Empire of Corpses (2015) BDRip 720p | AniDub, AniChaos