Infrastructure and Systems Implementation Plan
Sabrenna Anderson
Kaplan University

Primary Contact | Name | Rosanne Moran | | Phone | 732-930-3800 | | Email | rmoran@wint.net | Backup Contact | Name | Sabrenna Anderson | | Phone | 732-656-3575 | | Email | sanderson@wint.net |

Proposal
Type | Idea To Be Explored Potentially Identified Solution | Project
Type | New Project Enhancement to Existing or Former Project |

Working Title of Project | Infrastructure and Systems Implementation Plan | Project Sponsors | WInt IT department, Rosanne Moran, IT Director. |

-------------------------------------------------

-------------------------------------------------
Introduction
Widgets International, Inc. currently consists of Widgets USA, LLC and Widgets-R-Us, LTD. Combined Widgets International, Inc. has 50 years of experience in providing function critical assembly and machinery solutions. WUSA has cornered the Business to Business market while WRU has grown in leaps and bounds in the retail market. Together as Widgets International, Inc., they stand to increase their market share substantially by creating and offering innovative and cost effective assembly solutions globally. (Anderson, Unit1, 2014)
-------------------------------------------------

-------------------------------------------------
Purpose and Justification
This proposal will explore the requirements for the application and implementation of an easily manageable information system that will be an effective and efficient agent in expanding the organization internationally. To date we have considered the benefits of Internet access, a private Intranet, an Extranet, Supply Chain Management (SCM), Enterprise Resource Planning (ERP), E-Commerce, Product Lifecycle Management (PLM), Customer Relationship Management (CRM), and the current and future infrastructure…...

Similar Documents

Premium Essay

Implementation Plan

...Implementing an Effective Risk Management Program The Guiding Principles of Risk Management (RM) A. Integrate RM into all phases of missions and operations. Effective RM requires that the process be integrated into all phases of mission or operational planning, preparation, execution, and recovery on a continuing basis. It is much more cost effective to plan up front during building construction and renovation to imbed safety, fire and environmental protection systems than to retro-fit after the fact. B. Make risk decisions at the appropriate level. As a decision-making tool, RM is only effective when the information is concentrated on the appropriate supervisory level for decision. The higher the risk, the higher the management level of who should make the decision to accept a risk or not. Often this will require the decision to apply resources, whether manpower, dollars or both, to mitigate risks to an acceptable level so the management decision-making level must be where the purse strings are controlled. C. Accept no unnecessary risk. Accept no level of risk unless the potential gain or benefit outweighs the potential loss. RM is a decision-making tool to assist the supervisor or individual in identifying, assessing, and controlling risks in order to make informed decisions that balance risk costs (potential losses) against mission benefits (potential gains). An unnecessary risk is one that if not taken, you can still accomplish the mission. For......

Words: 4698 - Pages: 19

Free Essay

Is535 Implementation Plan

...* Running Header: EAGLE MAIL IMPLEMENTATION PLAN IS 535 - Managerial Applications of Information Technology 4/10/2012 Contents Section I: Purpose of Plan Section II: Strategic Business Plan Rationale Disruptive Forces in USPS Market: Opportunity for Future Relevance: Raison d'être/ Justification for plan: Porter’s Model and EagleMail I. Rivalry among Competing Firms II. Potential Development of Substitutes III. Buyer Power IV. Bargaining Power of suppliers V. Threat Of New Entrants Rationale Summarized Section III: Current Systems Major Systems Supporting Business Functions and Processes List of Current USPS MIS Specific Examples of Innovation by Foreign Postal Services Section IV: New Developments System Projects Identity and access management Account Creation Figure 1: Overview of Account Creation Process Email infrastructure Figure 2: Illustration of Email Process in Company Environment Web portal Business Information Systems Business continuity and disaster recovery Section V: Management Strategy Senior Management: Middle Management: Security Validation: Sales and Marketing: Human Resources: Operational Management: Section VI: Budget Requirements Budgeting the New Implementations Table 1: Illustration of Costs for Implementation of Proof of Concept EagleMail Plan Cost benefits and models to evaluate the cost and assets. Is the project at risk? What are the......

Words: 16382 - Pages: 66

Premium Essay

System Implementation

...System Implementation When it comes to implementing or installing a new system within a company or organization, there are many factors to consider, not only technology. System implementation takes place when testing is complete and the team and project manager become responsible for implementing the new information system successfully for the sponsor or for the client’s organization or company. A successful implementation can result in overall organizational efficiency and also strengthen the organization. However, a failed implementation can result in a strain on funds, schedule, and on the organization. Even though there are different implementation methods, there are more things to consider such as: commitment, risks, resistance, user involvement, training, and planning. User commitment plays a huge factor on implementing and installing a system successfully. An implementation method, such as direct cutover, will create a huge sense of commitment. When the direct cutover method is used, the old system is being disposed of and the new one is being installed. It is as if yesterday, you were using an old computer or system, and today you came in and there is a new computer or system in front of you. This method creates a huge sense of commitment with users because there is no system to go back to. When it comes to user commitment, the user must also be committed to change. The company or organization must be willing to implement changes, procedures, structure, and any...

Words: 1301 - Pages: 6

Premium Essay

Implementation Plan

...Implementation Plan CMGT/445 Implementation Plan Project Name: City of Tuscon Case Management Software (City of Tucson, 2013) Project Stakeholders City of Tucson Arizona Nathan Daou - Nathan.Daou@tucsonaz.gov – Contract Officer Project Description * The purpose of this project is to provide the City of Tucson Attorney with Case Management Software * The main challenge of this project will be to provide a proven, open system standards-based solution that requires little or no custom software development to meet the requirements stated in this solicitation * The desired outcome of this project is to improve productivity for the City of Tucson Attorney in this management of cases. Measurable Organizational Value (MOV) · The primary measure of value for this project will be to provide the City of Tucson, AZ with a case management software application to increase productivity of the City Attorney and staff as well as provide a new case management application to replace the old software being used. Employee satisfaction with the improvement can be surveyed and used to further measure the organizational success of this project. Project Scope · The City of Tucson Attorney’s office and the offices of his staff and secretaries will be fitted with new computer systems, upon approval, as well as a copy of the new case management software in a client/server configuration in order to allow all members of the City Attorney’s staff real......

Words: 858 - Pages: 4

Premium Essay

Systems Design, Implementation, and Operation

... SYSTEMS DESIGN, IMPLEMENTATION, AND OPERATION SUGGESTED ANSWERS TO DISCUSSION QUESTIONS 22.1 Prism Glass is converting to a new information system. To expedite and speed up implementation, the CEO asked your consulting team to postpone establishing standards and controls until after the system is fully operational. How should you respond to the CEO’s request? The consulting team should strongly advise the CEO that postponing standards and controls is not advisable. Rather than save time and money, the company will probably lose time in the future when unanticipated problems and weaknesses arise due to the lack of standards and controls. The following are reasons why performance standards and control procedures should be established before the system becomes operational: * Internal control considerations must be taken into account when assigning job responsibilities. * Job descriptions and work schedules must include the various control procedures. * Performance standards associated with each position must be considered when selecting personnel to operate the system. * Documentation standards and data security provisions must be formulated before the system can be operational. * Error checks must be built into all computer software systems. * ...

Words: 8326 - Pages: 34

Premium Essay

Implementation Plan

...Implementation Plan Simply formulating a strategic plan is not enough for success. The plan must also be successfully implemented for it to be successful. Implementation includes developing short-term objectives, identifying functional tactics, and determining key success factors. These items are critical for the successful implementation of UPMC’s new strategic plan. Short-Term Objectives WebFinance Inc. (2014) defines a short-term objective as “a smaller, intermediate milestone to achieve when moving towards an important goal” (para. 1). Short-term objectives are often long-term goals broken down into smaller pieces. By completing the short-term objectives, we are also completing parts of a long-term objective. The first long-term objective is to come to an agreement and a new contract with Highmark. Let’s see how we can develop some short-term goals from the long-term objective. By March 31, 2015, UPMC needs to start opening the lines of communication with Highmark. This will be done by stopping all anti-Highmark advertisements and propaganda and working to get the company to be agreeable to a new contract. Being the first to declare a cease-fire with Highmark will also go a long way with the people of Pittsburgh to build goodwill and a better reputation for UPMC. The next long-term objective is to dedicate more time and assets into the research and development of better treatment for age-related diseases. The first short-term objective to be......

Words: 893 - Pages: 4

Free Essay

Implementations of Quality System

...said, any delay in the process of delivering the power and water connections will relentlessly affect the reputation of the company provides it as well as will lead to unhappy customers. This is one of the reasons why Six-Sigma is becoming a part of the companies’ culture. Six-Sigma implementation would help us by statistical methods to measure the process in of a company’s procedure. Moreover, several additional points can be scored when we apply this framework such as the employees’ empowerment, leadership involvement and the satisfaction of the customers. This research attempts to study six sigma aspects in Abu Dhabi Distribution Company (ADDC) to improve the process of power connection procedures by using quality tools like Pareto chart, Control chart and fish bone diagram. Using of those tools prioritized the causes and controls it. Moreover, those quality tools showed up if the process is in control or not, Capable or not and Centered or not. In addition to that it is identify and isolate the major causes from minor causes. Introduction and background about ADWEA During the period from, UAE independent day on 1971 till 1998, the Emirate of Abu Dhabi has experienced a mega infrastructure development, including various utility services such as telecommunication, water and electricity, sewerage, etc. Considering the subject of the paper we are discussing, and in the view of the importance of both water and electricity during this development period, the aim was to......

Words: 2891 - Pages: 12

Free Essay

System Implementation

...System Implementation HCS 483 Jose Rivera 06/10/13 System choice and implementation is a process that requires much thought, planning, and considerations. There are four steps for selecting and acquiring an information system. The more carefully and detailed the steps are followed, the better the system will be for the organization. Goals need of the new system must be established. The new system must meet the goals and fit the needs of the organization to be functional. Each member of the process plays specific and important roles during the selection, implementation, and maintenance phases of the new system. Stakeholders There are many steps for selecting and acquiring an information system for an organization. An organization will need to know that their current system needs to be replaced. The need for replacement might be because the current system no longer fits the organizations needs or the costs to maintain the current system are too high. From there the steps are planning, selection, implementation, and support of a new health care information system, (Wagner, Lee, & Glaser, 2009, p. 5). “The primary focus of this planning and analysis phase is on the business problem, or the organizations strategy, independent of any technology that can or will be used,” (Wagner, Lee, & Glaser, 2009, p. 8). Now that it is clear there needs to be a new system implemented, the next step is to determine the functional needs and requirements. This step, if...

Words: 1120 - Pages: 5

Premium Essay

Implementation Plan

...environment. Some of the elements that make up the environment are the requirements for testing the design. This would include a test schedule, identifying the performance requirements, and developing a method to control test, so that there is a base or standard to compare it with. The test plan should also cover the required activities involved in the testing. The group needs to delegate the team’s roles and responsibilities. They will need to develop the testing schedule by preparing the test environment and identifying any risks. Next, is the actual set up. The test environment setup is a very important part of test phase. It represents the need focus on preventative measures to avoid pitfalls. The primary attention should be in the planning activities such as: * Track activities * Setup activities * Installing the hardware * Installing software The test team should consider the number of tests to be performed, the manner in which testing will be approached, and the test conditions that need to be applied. Most important of all, the test design standards and guidelines need to be defined and followed. This will ensure that we have an effective system, consisting of software testing, developing a similar lifecycle, and test analysis....

Words: 283 - Pages: 2

Premium Essay

Task 1c Implementation Plan

...Task 1(C) Implementation Plan • Formally assign ownership of field level IT Business Continuity initiatives to IT division CIO’s with an indirect ownership to IT Business Continuity to assure comprehensiveness of division level Business Continuity program requirements. • Provide the necessary resources and subject matter experts in the field of business continuity for each of the organization’s operational groups. • Mandate, define, develop, and implement the processes necessary to conduct a comprehensive risk assessment necessary to identify and define the potential risks and vulnerabilities to the decentralized information system infrastructure components, as similarly conducted for the Regional Data Centers, with the further requirements as mandated by HIPAA. • Perform risk management processes for the field level entities and their information system infrastructure, in order to prioritize and rank risks for mitigation purposes. • Conduct Application Impact Assessment (AIA) at field level facilities to identify and measure the effect of information system infrastructure resource loss and escalating losses over time in order to provide the business with reliable data upon which to base decisions concerning risk, hazard and vulnerability mitigation, recovery strategies, and continuity planning, as well as to provide application and data criticality analysis as addressed by the HIPAA Security Rule. • Implement......

Words: 639 - Pages: 3

Free Essay

Implementation of Obb System

...implementing OBB * Implementation of OBB in other countries | 356671011 | 3. | Conclusions | 12 | 4. | Recommendation | 14 | 5. | References | 15 | 6. | Appendices | | INTRODUCTION Budgeting in the public sector has evolved over the years. After Independence, we started with line-item budgeting that focused on expenditure. Under this approach, ministries and agencies were assessed on their ability to spend the approved allocation within a given year. Moreover, it lacked coordinated planning, performance measurements and systematic evaluation. Subsequently, a more results oriented Programme and Performance Budgeting System (PPBS) was adopted in 1969, where the focus shifted to outputs, with resources allocated for specific programmes and activities based on priorities. Systemic problems, however, continued to persist. There was lack of accountability, while decision making was highly centralized. To address these problems, the PPBS was improved and introduced as the Modified Budgeting System (MBS) in 1990. The system expounded the concept of “let managers manage” and held them accountable for their performance. However, even under this system, the emphasis was still on output, with each ministry and agency focusing on delivering its programmes and projects. This gave rise to duplication of efforts and resources across ministries. It soon became apparent that there were weak linkages between policy formulation, budgeting process as well as project......

Words: 3861 - Pages: 16

Free Essay

Implementation Plan

...Implementation Plan In order to host seasonal cook-offs we formulated a suggested step-by-step executing plan. We assumed that the first seasonal cook-off will take place in the spring. • Organizer presents idea to XXXX (January 08) o The purpose will be to get the rest of the committee interested and excited about the idea. • Contact local Chefs (January 22) o Explain the benefits to the chefs themselves. Outlining the media exposure and positive PR they would receive o Show the benefits their presence will provide to the Fernwood neighborhood o Asses the best possible date for them to attend the event • Set the date (February 12) o Taking in to consideration when most chefs will be available and the best time for XXXX and its volunteers • Generate volunteers (February 19) o Gather the volunteers who are willing to participate in this event o Possibly hire security guards if necessary for the event • Advertise the event (February 22) o Advertise through the local newspapers and magazines o Use the local radio stations o Put up banners and signs throughout the whole neighborhood and maybe the surrounding neighborhoods if appropriate o Spread the word and generate hype locally through word of mouth • Organize the equipment (March 08) o Rent necessary equipment the community doesn’t already have access to; such as tables, disposable plates, napkins and others • Host the event (March 26) o Holding this amazing event and hoping it is a success that will......

Words: 255 - Pages: 2

Free Essay

Implementation Plan

...Distance Education Implementation Plan Ed5804-Uo2a1 Pamela A. Scallan Capella University Dr. Ann Armstrong Topic: My topic is the Implementation of a Distance Educational Plan using technology to enhance the existing distance education curriculum, Pre-K-Grade 3, using Audio/Video Media Technology to enhance the reading skills to globally diverse learners, using the Content Management System in a single-site environment. Overview: I am going to attempt to provide a brief overview of the Technologies and Media addressing the interactive/recorded audio and video along with the use of the Internet for transmission of the audio/video material. Print media is used extensively in Distance Education thru the use of study guides, textbooks, reproducible materials such as articles from journals or excerpts of chapters or perhaps entire chapters, course notes created by the instructor for students or pertinent student information related to the course via instructor or institution under which the program is delivered. I choose the various forms of Audio and Video Media by which I will implement my plan as a topic (one lesson), globally from a single-site. When thinking about media and technology (Moore, 2007) suggests answers to the following questions: 1. What are the characteristics of different communication technologies and media, and how can they be used in distance education? 2. Which communications’ media and technologies are the best for......

Words: 659 - Pages: 3

Premium Essay

Cmit 495 Implementation Plan

...World-Wide Trading Company: Project Implementation Plan Group 3 Kristine Bird (AD Forest Domain OU, Groups and GPO Implementation) Ryan Bonisch (Contact list and LAN Implementation Tasks) Anthony Campo (Configuration of Routers, Switches, and VLANs) Gerald Casanada (Voice VLAN, Wireless, DHCP and DNS) Jennifer Coleman (AD Implementation and Tasks lists for AD Policies) Billie Jo Derouin (Security Implementation) Raymond Mack (Security Technology and Timeline) University of Maryland University College CMIT 495 Professor Sam Musa February 28, 2016 Table of Contents Introduction 2 Purpose 3 Implementation Requirements 3 Project Contact List 3 Tool List 3 Equipment Installation Plan 5 Project TimeLine 6 Lan Implementation task 7 Security Implementation task 11 Configuration Routers 41 Switches 46 VLAN Configurations 49 Voice VLAN and Wireless 51 DHCP and DNS 54 Active Directory Implementation Task 56 Active Directory Policies 58 AD Forest Domain OU formation/AD Group Formation/AD GPO Implementation 68 Security Technologies 88 Introduction The implementation of the WWTC is crucial to keep the business functioning and growing. To ensure that new office installation goes smooth group 3 will create a functional implementation plan from the design we proposed to WWTC over the last 7 weeks. Purpose The purpose of this plan is to provide a step by step guide on the network designed......

Words: 13687 - Pages: 55

Premium Essay

System Implementation

...Chapter Overview This chapter introduces students to many of the activities carried out during implementation, including coding, testing, installation, documentation, user training, and support for a system after it is installed. While most systems development texts do not include much material on implementation, the authors remedy this situation by providing material on relevant management issues, including change management, organizational politics, and implementation success. The authors also include a discussion of implementation failure, something few systems developments texts discuss, despite the high rate of information systems failure. The discussion of failure is presented in the context of factors the analyst (and project manager) can control in an attempt to ensure success. One of Chapter 17’s goals is to show the student that implementation is neither simple nor mechanical. Throughout the textbook, the authors emphasize that systems development is a change process. For many users, the most obvious evidence of change comes during implementation. Once a new system has been coded, tested, and installed, the systems development team does not simply walk away. The organizational members left with the new system, the users, need a solid understanding of how the new system fits into their work lives and how the system can support them in their day-to-day work activities. User documentation, training, and continuing support are all parts of providing this......

Words: 5612 - Pages: 23

Minoxidil 6 Month Kirkland 5% Extra Strength Men Hair Loss Treatment Regrowth | Deadman Wonderland | Overlord (2018) 720p BDRip Free Streaming