A Review of Risks Associated With Estimating a Home Building Project

Michael T Bell

PMAN 637

Originality Score 6%

A Review of Risks Associated With Estimating a Home Building Project

Introduction

In building and construction, there are risks associated with estimating a home building project. These risks in construction are all the same across the board regardless the construction. Therefore, a home building projects is confronted with the same risks as any other project in the construction industry. The risks involved are such as; project management risks. The project management risks are mainly because of improper schedule. The improper schedule may be caused by poor allocation of time in various projects that may be involved in a home building project. Poor resource planning is another management risk. This is because due to poor allocation of resources often lead to misuse and many unaccounted losses. In addition, improper and poor management of disciplines or methodologies result into management risks in a home building project. Disciplines and methodologies are tricky and need a lot of experience to manage. Therefore, a minor mistake in management of discipline and methodology is a risk that can cause a huge negative impact in a home building project. Such risks are better identified with scheduled risks.

Organizational risk is a major risk that most building and construction projects have to face, Most organizational risks in home building projects results from issues such as; resource conflicts. Such conflicts are brought about by the occurrence of multiple projects that take place. The projects include factors such as, time, scope and cost objectives. Depending on the organizational structure of a building project, such risks might end up being unrealistic I terms of finishing a project on time,…...

Similar Documents

Premium Essay

Take Home Project

...Take Home Project 1. BUSINESS FORMATION a. What form would be required to form a Limited Liability Company? Articles of Organization b. What form would be required to form a Corporation? Articles of Incorporation c. Does an attorney need to sign the organization documents for an LLC? No but it may be in the best interest for the organization d. Does an attorney need to sign the organization documents for a Corporation? No, but it may be in the best interest for the organization e. What are the filing fees associated with filing an LLC and a Corporation? $110 for both and the CL-1 is $25 f. Are there annual fees to be paid to the state for an LLC or Corporation? Both LLC and Corporation have to pay $10 fees g. Does a Corporation doing business in SC but formed in another state have to register with the State of South Carolina? Yes, they are required to register every location that their business resides in h. Does a General Partnership have to file anything with the Secretary of State? No. 2. BUSINESS LICENSES AND TAX REGISTRATION For this portion- I chose to run an S CORP for my liquor store which sells tobacco, wine, and liquor. My three employees are my cashier, stocker, and manager. a. In Charleston, all businesses are required to have an annual business license for each location. There is a five step process for obtaining this business license. First- Zoning Compliance. The city encourages every business......

Words: 2055 - Pages: 9

Premium Essay

Final Project Risk Managment

...Introduction of the purpose and importance of risk management Risk management planning is a critical and often overlooked process on every project.  Allowing for the proper amount of risk planning in your project schedule can mean the difference between project success and project failure when those potential risks become real issues. The plan is only the output of the process. It details how the process will be implemented, monitored, and controlled through the life of this project. It details how the group will manage risks but doesn’t attempt to define the responses to individual risks. Risks come about for many reasons, some are internal to the project, and some are external such as but not limited to the project environment, the management process, planning process, inadequate resources, and other unforseen instances that can contribute to risk. Risks associated with the project generally concern the objectives, which turn to impact time, cost, or quality, or combination of those three things. Risk management provides assurance that an organization can create and implement an effective plan to prevent losses or reduce the impact if the a loss occurs. A good plan includes strategies and techniques for recognizing and confronting the threats, solutions for both preventing and solving the situation and indicates financial opportunities. An effective risk management practice does not terminate risks. However, an effective and operational risk management practice......

Words: 3711 - Pages: 15

Free Essay

Building Project Proposal

...Smith’s House Project Progress Report 12/16/2012 ABC Construction Inc. Project Manager TABLE OF CONTENTS introductioN 1 Major Project activities 1 ASSUMPTIONS 2 ORIGINAL PROJECT Network schedule 3 Project Responsibility Matrix 4 Project cost summary 5 COST ASSUMPTIONS 5 CHANGE REQUEST format 7 revised schedule analysis 7 REVISED PROJECT SCHEDULE 8 REVISED COST SUMMARY 9 SUMMARY 10 REFERENCES 11 introductioN Mr Smith wants to build a 2-storey framed house and so he has appointed ABC construction Inc. for construction of the house. Mr Smith has got the blue prints ready through XYZ architects and has issued the letter of intent to ABC Inc. with a project deadline of 14 weeks. The contract clauses include penalty for delays and bonus for early completion. The material procurement is excluded from the scope of ABC Inc. and it’s a free issue material through a local vendor fixed by Mr Smith. The project has progressed into its 6 week and activity 9 is under progress. Mr Smith now wants to change the original configuration of the house by adding a wing to it. A formal change request has been raised and this report analyses the effect of the change on the schedule and cost of the project. A copy of the change request form is also attached. The main stake holders in this project are: * Mr Smith as investors and owner. * XYZ architects as consultants. * Material supplier * ABC Construction Inc. as project construction......

Words: 1502 - Pages: 7

Premium Essay

Project Risk

...Project Risk and Risk Management Ryan Hawker AMGT440-E1WW (F14) Susan Craver 9/18/2014 For this assignment we will be discussing the project risks and how to appropriately manage those risks. We will specifically identify three possible risks to my team project and how this risk will impact the quality of my product. After this is accomplished we will take these individual risks and discuss how to manage them and possibly prevent the risk from becoming a reality. For every project there is some amount of risk but minimizing these risks is a job to which everyone should focus. The project that I am working one is project 2. My company provides web hosting services. A startup company has approached us asking for an online store offering the apps it is developing. There are a few major tasks to be accomplished in this scenario. The first one is to procure and configure web server. The next step involves developing the website and configuring a payment processing solution. Lastly we need to launch a promotional campaign for the website. During this project a lot of small things can go wrong so we need to predict the risks that are associated. The first and possibly one of the worst risks that would be associated with this project is procuring the web server. When ordering this web server we need to obtain it in less than a week so we can configure it by weeks end. If this shipment is late we would need either a backup web server that has already been configured or......

Words: 1155 - Pages: 5

Free Essay

Project Risk

...identifying project risks are equally important to the success of a project. Develop at least three risks that could potentially cause the scope, cost, or schedule of the project to slip. How can Janet plan for and avoid these risks? Does the likelihood of these risks affect Janet’s actions? How? For this project I see three risk events that Janet would need to manage and mitigate. These are very likely risk occurrences that can cause the project scope cost and or schedule to slip. Risk Event 1 The project being completed in a timely manner. The time line is very small and has several major holidays to consider with respect to the calendar year.Would need to monitor and crash the schedule through out the process in order to meet the expectations of the stakeholders. Risk Event 2 Human resources issues as related to conflict between team members as well as HR issues as related to availability of staff member and fact that this would be the first time some of the team members would be working together. Additionally manging a team that is spread between two cities can be an issues with respect to HR. Risk Event 3 Issues related to general contractor and construction permitting process. Since this would be an expansion in a new market, this could be a potential area for risk if the contractors associated with these task aren’t up for the task. Based on the probability and impact of each event I would prioritize the risk as : Risk Event 3 Risk......

Words: 312 - Pages: 2

Premium Essay

Home Buying Risk Paper

...Risk Paper 1 Risks Involved During The Purchase Of Our Home 1/25/2015 Class: Proj-595 Professor: Dr Madireddy [Type the author name]   • INTRODUCTION In the spring of 2013 my family embarked on a new adventure. We moved 2800 miles from San Diego CA. to Franklinton NC. because of a promotion I accepted with my company. This was a very exciting and frightening time of transition for my family. There were many changes we had to make as well as some very important decisions to make. The biggest decision and question we had to make and answerer was are we going to buy a home or are we going to rent? Once the decision was made we were going to buy a home many questions and decisions had to be made and many risks had to be addressed. The risks we had to address when looking at purchasing a home include financial risks and environmental risks. • RISKS INVOVLED DURRING THE PURCHASE OF OUR HOME Home buying is a very exciting experience. Whether you are a first-time buyer or an experienced owner, buying a house requires a "preflight check," in the words of Barry Zigas, director of housing policy for the Consumer Federation of America. (Dratch) Before doing any risks assessments we first had to put down the home purchase into a pros and cons diagram to see if this was something we were willing to take on. With that decided we then proceeded to look at the risks involved. As my family experienced and statistics have shown that owning a home is......

Words: 683 - Pages: 3

Premium Essay

Project Risk Management Process

...1st draft Do Thi Ha Phuong 18249037 RISK MANAGEMENT 641 - ASSIGNMENT NO 1 TOPIC: PROJECT RISK MANAGEMENT PROCESS PART A – APPLICATION About the company and its functions. Joint Stock Company BT20 is established in 28/03/2012. The company operates in road construction areas. The company is implementing a restoration, renovation National Highway 20 project in Vietnam, Required main tasks of company are: clearance and compensation, the basic construction work, mine clearance, leveling, construction of roads, drainage and wastewater treatment systems, trees, power supply system. As well as any other investment, construction investment is likely to encounter risks to be inefficient investment as originally planned. Type of risks | Sub risk | Sub-Sub risk | Financial | Cost increases | Unreasonable Estimated costs.Weak Project Management | Natural | Unfavorable weather | - Raining- Storm | | Disaster | - Blood- Earthquake- Flooding | Safety | Accident in construction site | - Delay the construction- Reducing on reputant of company. | Time | Project duration is extended | - Cost for material increase- Lack of employee’s skills- Wrong estimate on cost- Lack of skill on project management. | 1. RISK IDENTIFICATION The effectiveness of the project is determined by three factors that are quality, cost and time (Saladis and Kerzner 2011). For the before and during the construction of NH20, the cost is considered to be one of the serious issues......

Words: 4121 - Pages: 17

Premium Essay

Risk Management - Buying a Home

...Proj 595 - Risk Paper 1 Pm595 Risk Paper: Buying a new house Project Risk Management Professor: James Reckon Authored: Michael Arcoli December 18, 2015 TITLE: Purchasing A HOUSE TABLE OF CONTENTS INTRODUCTION RISKS IDENTIFICATION RISKS RANKING MATRIX RISKS MONITORING CONCLUSION REFERENCES * INTRODUCTION Whenever considering a major purchase in life one must carefully consider the risks associated with making these purchase decisions. These decisions should be treated as projects in such a way that proper planning, analysis, risk assessment and contingency should all be aspects of the purchase process whether formal or informal. In this paper, I will discuss about a project that many people are familiar to: buying a new house. Few years ago, I moved to a new area and was trying to decide whether or not to purchase a new house, and if so, where should I buy it. I also considered if I should buy a preexisting new house or hire a builder for a new house. Every option had its own set of potential risks. If I continued to rent, was this really just throwing away money. If I purchased a house, could I afford it and was I buying the best house for me and my family? I approached it like any other project, with interviewing people, note collecting, collating, and interpreting the data. After reviewing my expenses and income and examining the tax advantages, I decided to buy a house but knowing that several risks may accompany my decisions,......

Words: 333 - Pages: 2

Premium Essay

Basics of Estimation and Building a Risk Register in Project Management Office

...Title: Basics of Estimation and Building a Risk Register in Project Management Office Authors Name: 1. Dr. Balbir Singh 2. Dr. Lakshmi B. Affiliation: Administrative Staff College of India Mailing Address: balbirahs@gmail.com Mobile: 9059350790 Key Words: Project Management Office, Cost Estimation, Risk, Benchmark, Strategy. Basics of Estimation and Building a Risk Register in Project Management Office Abstract: Analysis of measurement data from multiple projects allows the organization to formulate new estimating models and also to set certain benchmarks. Hence it is important to make measurement an integral part of the estimating process. Later, when we get ready to identify a risk, one thing that we must ask our self is what could greatly block the team or project from being able to achieve its objectives? When we take the time to figure out what may have an impact on our ability to reach our goals, this will give us the foundation which is necessary to properly construct the risk register. Key Words: Project Management Office, Cost Estimation, Risk, Benchmark, Strategy. Introduction: The success of software projects depends largely on the Effort and Cost Estimation. Consequentially, a lot of work is done proposing good estimation procedure but without any convincing results. In this article we will see some ways on improving the accuracy of estimation. What are estimates? The word “estimate” is to produce a statement of the approximate value of some quantity.......

Words: 1550 - Pages: 7

Premium Essay

Project Risk Cost

...Preparing Project Budgets for Business Cases Technical guide The Secretary Department of Treasury and Finance 1 Treasury Place Melbourne Victoria 3002 Australia Telephone: +61 3 9651 5111 Facsimile: +61 3 9651 5298 www.dtf.vic.gov.au Authorised by the Victorian Government 1 Treasury Place, Melbourne, 3002 © Copyright State of Victoria 2012 This book is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968. ISBN 978-1-922045-92-8 Published August 2012. If you would like to receive this publication in an accessible format please telephone 9651 0909 or email mailto:information@dtf.vic.gov.au Contents 1. Background 1 1.1 Context 1 1.2 Purpose – developing and managing project budgets 2 1.3 Scope of application 2 1.4 Structure of this guide 3 1.5 Related guides and frameworks 3 1.6 The need for an accurate project budget 4 2. Elements of a project budget 5 2.1 The headline elements of a project budget 5 2.2 Successful financial planning 9 2.3 The need for a whole-of-life approach 10 2.4 ‘Poor project planning’ risks are not project risks! 10 2.5 Delivering to budget 11 3. Foundations for good project budgets 12 3.1 Better business cases and better project budgets 12 ...

Words: 21569 - Pages: 87

Free Essay

Risk of Using Oxygen a Home

...From the article “Oxygen Therapy in the Home” there are many roles a community health nurse can do to ensure proper use and safe use of HME (Home Medical Equipment). The first one is being a teacher or an instructor on how to safely use HME in our case being the Oxygen equipment. Mr. Jones as we have seen in the discussion knew how to use the oxygen supply equipment but did not know how to use it safely. A nurse is in a position to understand how the equipment works and how to handle them safely. It is clear that the brief encounter between Mr. Jones and the sale representative of the HME company was not enough to make Mr. Jones understand safety precautions behind his HME. The sales representative of the company is a representation of the many characteristics of the companies who supply HME and are always in greed for money and not saving life. If the sales representative took some time to explain to Mr. Jones the precautions to be taken when using the Oxygen supply machine, it could have saved him a lot. However, the community nurse practitioner in charge of taking care of Mr. Jones should not only teach him how to use it but the precautions to observe when using it. This includes avoiding naked flames, avoiding smoking as well as installing smoke detectors in the room where oxygen is being used to raise fire alarm in case a fire starts. These basic safety education tips from a nursing practitioner can help save life and ensure safe usage of any Oxygen HME. The other role...

Words: 600 - Pages: 3

Premium Essay

Deck Building Project

...A Project Plan for Building a Custom Backyard Deck Duane Skidmore Iana Arsova Mara Southard Parrish Major Embry-Riddle Aeronautical University Course: PGMT 501, Fundamentals of Project Management Term: January 9 – March 11, 2012 Table of Contents Scope………………………………………………………………………………………………7 Project Charter…………………………………………………………………………………….9 Work Breakdown Structure (WBS)……………………………………………………………...14 Schedule………………………………………………………………………………………….16 Cost Estimate…………………………………………………………………………………….18 Preparation Costs………………………………………………………………………...18 Construction Costs……………………………………………………………………….19 Clean-up Costs…………………………………………………………………………...21 Project Cash Flow Plan…………………………………………………………………………..22 Resource Allocation Plan………………………………………………………………………...24 Roles and Responsibilities……………………………………………………………….24 Project Organizational Chart……………………………………………………………..25 Responsible, Accountable, Consulted, and Informed (RACI)…………………………..26 Communications Management Plan……………………………………………………………..28 Introduction………………………………………………………………………………28 Communications Management Approach………………………………………………..29 Roles……………………………………………………………………………………..29 Homeowner………………………………………………………………………29 Project Manager………………………………………………………………….29 Project Team……………………………………………………………………..30 Homeowners Association (HOA)………………………………………………..30 Design Lead……………………………………………………………………...30 Project Team Directory…………………………………………………………………..30 Guidelines for......

Words: 8397 - Pages: 34

Premium Essay

Project Risk Leadership

...Environmental Quality International in SIWA BUS 519 – Project Risk Leadership   Analyze and describe the founding leader(s), leadership style, and major business principles of a profit-oriented entrepreneurial approach in which the primary goal is to provide a product or service to consumers and to make a profit. The following leaders , Larry Page, Sergey Brin (Google), Thomas Edison (Light Bub), Vicor Kiam (Remington Electric Shavers), Peter Drucker (Management Thinking), Blake Mycoskie (TOMS) and Anita Roddick (The Body Shop). The leaders all had a similar leadership style; they looked for innovative ideas and customer needs and invested their own money along with securing funds from investors. They had a vision, to be the best, make an impact and use constructive feedback to learn from it and improve on the bottom-line. They did not use the media to promote their product rather used their product to be innovative and allowed it to promote itself to get market share. Successful Entrepreneurs study and learn from how to make a profit by aligning their business strategy from entrepreneurs that have gone through and documented their lessons learned. The primary goal of the leadership style was to provide a niche and service to consumers and make a profit. Analyze and describe the founding leader(s), leadership style, and major business principles of a social-responsibility oriented entrepreneurial approach in which the primary is goal......

Words: 1234 - Pages: 5

Premium Essay

Home Depot Operational Project

...CONFORMING LETTER Home Depot Inc. Dear Home Depot Inc. Management, As a partner of KNAM LLC, it is my pleasure to present you with the results of our initial review. Included with these results is our assessment of Home Depot Inc.’s performance is our proposition of areas we’d like to review further to determine improvements, efficiency, functionality, and health of your organization. Background Your organization’s core service is in the DIY home improvement market. You sell goods that consumers need for home improvement as well as advice on said projects, contracting services, lawn and garden, and appliances and tools. Your organization was founded in 1978 with the purpose of providing DIY one-stop shopping. Since inception, Home Depot Inc. has grown to become a multinational company with foundations strongly in the United States with roots in the Canadian, Mexican, and Chinese markets. Shortly after inception, Home Depot Inc. enlisted on NASDAQ and the NYSE. Your company has seen considerable growth in its main business as well as developments in subsidiary businesses and services. Home Depot Inc. has become one of the fastest growing retailers in America and as such, you would like to review the operations of your organization to determine areas of further growth and areas that may need to be leaner. Objectives of the Operational Review As a result of our initial review and interviews with your executive management...

Words: 8379 - Pages: 34

Premium Essay

Project Risk

...GOAL DEFINITION AND PERFORMANCE INDICATORS IN SOFT PROJECTS: BUILDING A COMPETITIVE INTELLIGENCE SYSTEM (CIS) François Lacasse Université du Québec à Hull INTRODUCTION This paper describes a "soft" project: the setting up of a competitive intelligence system (CIS) in an agency of government. This case serves to illustrate: 1. how project management methods can be successfully applied to situations where the objectives are, at the outset, relatively unclear 2. how success requirements were determined and subsequently used to keep the project on track and how, even in nebulous areas such as "managerial technology," such indicators can be selected and applied 3. how performance indicators need to be tackled early on for purposes of control and, more importantly, for sharpening the planning and implementation processes. After describing the context of the project, we review the project itself. The conclusion draws some lessons on the specifics of managing soft projects. THE CONTEXT AND THE PROJECT The government agency where the project took place is concerned with tourism; its mandate is similar to other governmental tourism bodies throughout the world, that is, marketing and promotion, assistance to private sector industries related to tourism (grants, technical support, standards, etc.). The organization is structured into three divisions: marketing, product development and research, and policy (including most data collection......

Words: 685 - Pages: 3

Die Muppets erobern Manhattan | All AmericanS01E09 | Barbados