Premium Essay

System Engineering

In: Computers and Technology

Submitted By deva01dutta
Words 5274
Pages 22
Preparation of Papers for AIAA Technical Conferences

First A. Author[1] and Second B. Author, Jr.[2]
Business or Academic Affiliation 1, City, State, Zip Code

Third Author[3]
Business or Academic Affiliation 2, City, Province, Zip Code, Country

and

Fourth C. Author[4]
Business or Academic Affiliation 2, City, State, Zip Code

These instructions give you guidelines for preparing papers for AIAA Technical Conferences. Use this document as a template if you are using Microsoft Word 2000-XP or later, or Word for Mac OS X. Otherwise, use this document as an instruction set. Define all symbols used in the abstract. Do not cite references in the abstract. The footnote on the first page should list the Job Title and AIAA Member Grade for each author.

Nomenclature

A = amplitude of oscillation a = cylinder diameter
Cp = pressure coefficient
Cx = force coefficient in the x direction
Cy = force coefficient in the y direction c = chord dt = time step
Fx = X component of the resultant pressure force acting on the vehicle
Fy = Y component of the resultant pressure force acting on the vehicle f, g = generic functions h = height i = time index during navigation j = waypoint index
K = trailing-edge (TE) nondimensional angular deflection rate

Introduction

T
HIS document is a template for Microsoft Word version 2000-XP, Microsoft Word version 2003, or Word for Mac OS X. If you are reading a hardcopy or PDF version of this document, please download the electronic template file, Papers_Template.dot, from the AIAA Meeting Papers Information Page ((“Conferences & Events>Submit/Edit a Paper>Author Kit and Meeting Papers Template” from the AIAA Web site) so you can use it to prepare your manuscript.
Authors using Microsoft Word will first need to save the Papers_Template.dot file in the “Templates” directory of their hard drive. To do so,…...

Similar Documents

Premium Essay

Case: Re-Engineering the Payment Process System at Rfc

...ERP-systems (1729) Case: Re-engineering the Payment Process System at RFC Question 1: Draw a current process model for the payment processing system at RFC. Question 2: What changes in business processes and information do you feel will improve the payment processing system at RFC? Main system I would consider to adding a central server at the headquarters of RFC. Especially since they are considering to expand in the next three years. Using a central server gives the branches the opportunity to be up-to-date in real-time. To accomplish this, all branches need an Internet connection with a VPN connection to the headquarters central server. Every branch has its own ERP branch software that is connected to the headquarters ERP system and therefore also with the central server. When using a process like this it is important that the ERP systems know when someone is watching a certain profile or editing it as it will prevent errors and or double entries. The vouchers and bank receipts will not be used anymore and will be replaced by the ERP system. Customers have to sign a form whether they pay at a branch or at the HQ. If a branch deposited the money, an e-mail will be sent to the branch and HQ to inform the employees. The bank will send data to the main server that updates the main ERP system and thereby also the ERP branch software. Customers It is a must for customers to be able to use a web application that gives them the opportunity to pay online and...

Words: 966 - Pages: 4

Premium Essay

Engineering

... ENGINEERING ETHICS Concepts and Cases This page intentionally left blank F O U R T H ENGINEERING ETHICS Concepts and Cases g E D I T I O N CHARLES E. HARRIS Texas A&M University MICHAEL S. PRITCHARD Western Michigan University MICHAEL J. RABINS Texas A&M University Australia • Brazil • Japan • Korea • Mexico • Singapore • Spain • United Kingdom • United States Engineering Ethics: Concepts and Cases, Fourth Edition Charles E. Harris, Michael S. Pritchard, and Michael J. Rabins Acquisitions Editor: Worth Hawes Assistant Editor: Sarah Perkins Editorial Assistant: Daniel Vivacqua Technology Project Manager: Diane Akerman Marketing Manager: Christina Shea Marketing Assistant: Mary Anne Payumo Marketing Communications Manager: Tami Strang Project Manager, Editorial Production: Matt Ballantyne Creative Director: Rob Hugel Art Director: Cate Barr Print Buyer: Paula Vang Permissions Editor: Mardell Glinski-Schultz Production Service: Aaron Downey, Matrix Productions Inc. Copy Editor: Dan Hays Cover Designer: RHDG/Tim Heraldo Cover Image: SuperStock/Henry Beeker Compositor: International Typesetting and Composition  c 2009, 2005 Wadsworth, Cengage Learning ALL RIGHTS RESERVED. No part of this work covered by the copyright herein may be reproduced, transmitted, stored, or used in any form or by any means graphic, electronic, or mechanical, including but not limited to photocopying, recording, scanning, digitizing, taping, Web distribution...

Words: 48169 - Pages: 193

Premium Essay

Re-Engineering the Payment Processing System at Rfc

...Question 2 The company RFC encounters some difficulties in its payment processing system. Re-engineering might solve some of the issues faced by its managers. First of all, a full understanding of the five different problems RFC listed in this case study is necessary. Althought each one of these problem is unique, affects different part of the organisation and have their own consequences, they all come from the same origin: Complexity of information management and communication Process too slow Here are some possible changes that would improve the payment processing. Eliminate the possibility for the customer to pay in the Home Office directly. Indeed, the Home Office have huge difficulties to find informations about the payment, leading therefore to lots of errors of payments (Problem #1). This action will simplifies the payment processing and reduce factors of errors and clerical work (Problem #3). Beside, it will also reduce the time needed to make necessary file updating. There is a delay between the moment a payment is made, and the moment when this fact is taken into account in the business process database. Alas, no matter the changes in the processes, there will always be a little delay. In this case, batch payment processing is run every evening to update all data centrally, so the delay is at least 1 day long. An action would be to urge managers of the branchs to hurry to update particuliary important file each time they have to make a......

Words: 530 - Pages: 3

Premium Essay

Engineering

...Topic Tar sands oil spill in arkansas Name Nadya Sanjaya SID 1412251 DELETE THIS PAGE WHEN YOU HAND IN THE EXAM Objective: This take home exam is designed to test your understanding and interpretation of engineering ethics principles and social science issues as related to contemporary engineering problems. Procedure: Select a current engineering topic that is not the Dreamliner. Follow the questions on the subsequent pages. Writing format: Times new roman font, 12 pt. Single-spaced with justified margins. Just like on this page here. One space in between each paragraph. Email the final copy to r.angelo.borrelli@gmail.com. Points will be deducted for incorrect format. Citations: Please cite all sources you use. In the text of the paper, please use a superscript when you make a citation, like this.1 Then, in the REFERENCES section, list your sources in order. Length: ‘Sufficient.’ I am not going to give a set page limit. Be concise but show depth. Writing style: You will be writing in some form, whether technical writing or essays, and then when you get jobs in the real world. There is no time to start practicing like now. Grammar and spelling are part of the grade! Proof-read your paper several times! 1. Introduction [10] Please introduce your topic and explain why it is important to you. The topic I’m writing is about the tar sands oil spill in Mayflower, Arkansas. ExxonMobil, the company that runs the pipeline was in charge of......

Words: 3532 - Pages: 15

Premium Essay

Systems Engineering

...MICHEAL OHENE P.O.BOX AT 2273 ACHIMOTA-ACCRA GHANA 10TH FEBRUARY,2014. Dear Sir/Madam, A LETTER OF AGREEMENT. Mr Micheal Ohene the owner of Nissan Almera with the registration number GS 8303 13 has finalized the agreement between Mr. ___________ ___________with the telephone number ________________on the __________2014 in Accra. On this note, the vehicle is been given to you on a work and pay basis for the duration of 2 years and 3 months including the repairs of all minor maintenances on the Vehicle. TERMS AND CONDITIONS INVOLVED. 1.The vehicle is bought at the total cost of GH 12.000 ( Twelve thousand Ghana Cedi’s) and the agreement will be twice the amount which is equivalent to GH 23.000(Twenty Three Thousand Ghana cedi’s). 2. The owner of the Vehicle will repair any Major fault that comes in contact with it. 3. It is agreed that you will perform weekly sales of which the driver will come with the Vehicle for the owner to see the state at which the Vehicle is moving, so therefore the owner can examine his vehicle weekly. 4. Failure to produce sales as it’s been specified and agreed on. In 2 weeks, the Vehicle will be collected from you and you will again refund the funds in advance. 5. In most of all work and pay cases, the driver is supposed to lay down some amount of money before the vehicle is been given to him to ensure his seriousness but in this case nothing like that happened, meaning the driver didn’t pay anything before handling the......

Words: 325 - Pages: 2

Free Essay

Engineering

...Technology Group Practical Engineering Guidelines for Processing Plant Solutions Rev: 01 July 2011 www.klmtechgroup.com Author: KLM Technology Group #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia Viska Mulyandasari COOLING TOWER SELECTION AND SIZING (ENGINEERING DESIGN GUIDELINE) Checked by: Karl Kolmetz TABLE OF CONTENT INTRODUCTION Scope Cooling Tower GENERAL DESIGN CONSIDERATION Components of a Cooling Tower Tower materials Cooling Tower Design Consideration Operation Considerations Improving Energy Efficiency of Cooling Towers Tower Problems DEFINITIONS NOMENCLATURE 13 17 18 18 18 20 23 32 4 5 These design guideline are believed to be as accurate as possible, but are very general and not for specific design cases. They were designed for engineers to do preliminary designs and process specification sheets. The final design must always be guaranteed for the service selected by the manufacturing vendor, but these guidelines will greatly reduce the amount of up front engineering hours that are required to develop the final design. The guidelines are a training tool for young engineers or a resource for engineers with experience. This document is entrusted to the recipient personally, but the copyright remains with us. It must not be copied, reproduced or in any way communicated or made accessible to third parties without our written consent. KLM Technology Group Practical Engineering Guidelines for......

Words: 12674 - Pages: 51

Premium Essay

Engineering

...Construction Engineering This civil engineering branch deals with the planning, construction and maintenance of structures. Construction engineering is the planning and execution of designs from site development, environmental, structural, transportation and structural engineers. They must ensure that the plans that have been designed by other engineers are implemented to their exact specifications. Construction engineers will supervise field work during the entire project. They are in a sense a cross between an engineer and manager as they will oversee the project from start to finish and handle any problems that come up throughout the duration of the project. Structural Engineering This branch of civil engineering encompasses the structural analysis and design of structures. It is the responsibility of the structural engineer to analyze and design a structure that will safely bear or resist the stresses, forces and loads. The design must satisfy the project specifications while meeting all safety regulations. The structure must endure massive loads as well as natural disasters and climate changes. Geotechnical Engineering In geotechnical engineering the engineer studies soil, foundations and bearing capacities. The engineer will study the behavior of the earth materials and how they will affect a structure that is to be constructed. They will also evaluate pre-existing structures that are showing signs of problems with the earth materials under or near the......

Words: 798 - Pages: 4

Free Essay

Engineering

...abrasives belong to the fine ceramics category. The category of coarse ceramics includes, for example, brick or conventional refractory materials. It also refers to  refers to ceramic products for engineering applications. High-performance ceramic is defined in DIN V ENV 12 212 as a "highly-developed, high-strength ceramic material, which is primarily non-metallic and inorganic and possesses specific functional attributes." The concept high-performance ceramics is primarily used to distinguish them from traditional ceramics based on clay, including tableware, sanitary ware, walls and floor tiles as well as ceramics for civil engineering. This definition agrees with that of the "Japanese Fine Ceramics Association". Structural or construction ceramics are terms that have not yet been standardised, referring to materials that in some way must withstand mechanical stresses, bending or pressure for example. Functional ceramics are high-performance ceramics in which the inherent characteristics of the material play an active role, for example ceramic parts which possess specific electric, magnetic, dielectric or optical properties. Electrical ceramics are high-performance ceramics that are applied because of their specific electric or electronic characteristics. Electrical engineering applications make use primarily of the excellent insulating characteristics and mechanical strength. The electronics industry also takes advantage of characteristics such as ferroelectric......

Words: 2812 - Pages: 12

Premium Essay

System Engineering

...irrigation and without irrigation land that resulted in the amount of fertilizers and pesticides usage. Also the exponential decreasing loop B2 should be recognized as boiler of the big balancing loop. As sustainable way of dealing such problem, for the solvent of both available water resources and food, agricultural production, either of them could not be enhanced without the other. Reference Craig W. Kirkwood, 1998 “System Dynamics Methods: A Quick Introduction”, College of Business, Arizona State University.http://www.public.asu.edu/~kirkwood/sysdyn/SDIntro/SDIntro.htm Giraldo. D. P., Betancur M. J. 2004“Food Security in Development Countries: A systemic perspective” university of Pontificia Bolivariana, Colombia Lundqvist. J. 2000, “New Dimensions in water security”, Food and Agricultural of the united nations, Rome Sterman, John D.,2000, “Business Dynamics: Systems Thinking and Modeling for a Complex World”, Boston, Mass Taptiklis, N. and Taptiklis, N. 2013. “WATER RESILIENCE OR WATER SECURITY? MANAGING RESIDUAL RISK IN URBAN WATER SYSTEMS”. School of Geography, Environment and Earth Sciences, Victoria University of Wellington World Economic Forum. 2013. “Global Agenda Council on Water Security 2013.” http://www.weforum.org/content/global-agenda-council-water-security-2013, viewed 13 Sep 2013...

Words: 843 - Pages: 4

Free Essay

Engineering

...ENB100 - ENGINEERING & SUSTAINABILITY Progress Report (due in Wk12 Tutorial) ! Student Name: ! Student # Your task: Your role as a professional engineer will require you to assess multiple solutions for a single problem. Often, the suitability of the solution has little to do with the price or the provider but more to do with ‘fitness for purpose’. As such, it is vital that a structured process is used to identify the most appropriate solution. This process is called an evaluation matrix. ! Your task is two-fold. Firstly, in your own words, you need to define the term ‘evaluation matrix’. Make sure your definition relates to the engineering context and provide robust references. Secondly, you need to develop suitable criteria for use in your final project. Ensure you use clear and measurable criteria that take into account the client needs. ! ! ! 1. Definition An Evaluation matrices are used in the engineering profession as a tool to evaluate a number of different types of options against a prioritised criteria. If the design ideas do not meet the criteria then two different levels of the evaluation matrices can be used. The first level effectively acts as a filter with each different option evaluating it against the mandatory criteria. (UCLA, 1-2, 2014) para The design options that meed these mandatory criteria then go on to the second level with involves them being evaluated against prioritised criteria. This is vital this......

Words: 438 - Pages: 2

Free Essay

Engineering

...Task 1 Why does engineering equipment fail, what happens when it does and what can we do about it? Equipment’s fails because certain parts of it fail first and that prevents the whole process from working. It is important to understand the problem before any maintenance. There are a lot of reasons it could fail because of the age of the equipment and parts need to be changed or if the equipment vibrates nuts and bolts can be loosen and parts can fall apart. When this happens the machine needs to be stopped and maintained. Age is very important if the machine has been used for a very long time the efficiency and the quality wouldn’t be as good as a new one, a machine has a certain life span for example on a car the timing belt must be replaced after every 50,000 miles. Wear could lead to a fault in a machine because parts come into contact with each other for example a cars break pad. Corrosion in certain materials takes longer than others like aluminium, when a part of a machine corrodes it degrade and can cause failures. Raw materials such as oil and compressed air can run equipment’s. If something different unwanted to the equipment is in it, it can affect the way the machine works. For example water in a petrol tank will cause a car to break down and this is a fouling. Lack of maintenance can cause a fail, routine maintenance such as cleaning and lubrication. This cause for example in a factory that is manufacturing can will stop the line and check the cars in that line......

Words: 1288 - Pages: 6

Premium Essay

Systems Engineering Perplexity

...Systems Engineering Perplexity at Apple Systems Engineering Architecture and Design December 12, 2014 Abstract In response to the ever-increasing complexity of new products and systems, Systems Engineering has emerged as a distinct professional discipline in the past half century. It is an interdisciplinary approach to design, implementation and evaluation and helps to successfully develop complex systems. This paper provides a brief overview of the current gaps existing in today’s SE approaches exercised by the company Apple Inc. which is an American multinational corporation headquartered in Cupertino, California. They design, develop and sell online services, consumer electronics, computer software and personal computers (Apple Inc., 2014).This papers discusses the right/wrongdoings of Apple Inc. in the Systems Engineering domain, the changes they should be making and how they can implement these changes. Introduction and background Apple is the world's second-largest information technology company by revenue and the world's third-largest mobile phone maker. It is also the largest publicly traded corporation in the world by market capitalization, with an estimated market capitalization of $446 billion by January 2014. The Mac line of computers are its best-known hardware products, the iPod media player, the iPhone smartphone, and the iPad tablet computer. Its online services include iCloud, iTunes Store, and App Store. Apple's consumer software includes the OS......

Words: 2381 - Pages: 10

Premium Essay

Computer Systems Engineering

... NINTH EDITION Principles of Information Systems A Managerial Approach Ninth Edition Ralph M. Stair Professor Emeritus, Florida State University George W. Reynolds Australia · Canada · Mexico · Singapore · Spain · United Kingdom · United States Principles of Information Systems, A Managerial Approach, Ninth Edition by Ralph M. Stair and George W. Reynolds VP/Editorial Director: Jack Calhoun Senior Acquisitions Editor: Charles McCormick, Jr. © 2010 Course Technology, Cengage Learning ALL RIGHTS RESERVED. No part of this work covered by the copyright herein may be reproduced, transmitted, stored or used in any form or by any means graphic, electronic, or mechanical, including but not limited to photocopying, recording, scanning, digitizing, taping, Web distribution, information networks, or information storage and retrieval systems, except as permitted under Section 107 or 108 of the 1976 United States Copyright Act, without the prior written permission of the publisher. Product Manager: Kate Hennessy For product information and technology assistance, contact us at Cengage Learning Customer & Sales Support, 1–800–354–9706 Development Editor: Lisa Ruffolo, The Software Resource For permission to use material from this text or product, submit all requests online at cengage.com/permissions Further permissions questions can be emailed to permissionrequest@cengage.com Editorial Assistant: Bryn Lathrop Content Product Managers: Erin Dowler, Jennifer Goguen......

Words: 375753 - Pages: 1504

Premium Essay

Engineering

...Central Philippine University Jaro, Iloilo City School of Graduate Studies ACCIDENT CAUSATION THEORIES AND CONCEPTS (MENGR 711) In Partial Fulfilment to the Requirements of the Degree of Master in Engineering Submitted by: *** MENGR 711 Student Submitted to: *** Professor Date Submitted: October 1, 2015 All of us individuals must be obliged to be aware why accidents do happen in construction. Generally it is because of physical hazards which includes excessive noise and vibration, inadequate lighting, exposure to radiation, slippery surfaces, etc., environmental hazards is another reason such pollution, storm, earthquakes, etc., as well as human factors, even no safety regulations and lastly poor communication within, between, and among various trades working on a job site. An accident is defined as an unintended and unplanned occurrence that results in a negative effect. Accident causation theories have been developed in an attempt to predict accidents and thus prevent their occurrence. So far there has not been an accident prevention theory that has been universally accepted. They have however served in some preventative measures in some cases. For the record, an accident is technically anything that happens by chance or misfortune. This definition provides two important points. First, accidents are unavoidable as a whole; the chance of one occurring will virtually always be present. Second, the chance of an accident occurring......

Words: 2429 - Pages: 10

Free Essay

Engineering Power Systems

...ELEC C4612 Po ower Sys stem Ana alysis Midsess sion SOL LUTION ( (Session 1, 2016) n QUES STION 1 For the system sho own in Figu 1, comp ure pute the matrix. T system has an off-nominal The tap chan nging transformer betw ween buses 1 and 2 wi a tap setting of 1.03 The line b ith 3. between buses 1 and 4 has half line charging sus sceptance o 0.25 pu at each end. There is a mutual of a . ng u d own. couplin of 0.15 pu between lines 2-3 and 4-3 as sho 2 t = 1.03 1 3 j0.45 j0.4 4 j0.15 j0.1 j0. 2 j0.3 j0.1 4 Figure 1 on Solutio etween line 2-3 and 4-3 es Mutual coupling be = = 0.4 0.15 5 0.15 0.1 0 3 − 2 3 − 4 3 − 2 − 5.7143 8.5714 = 8.5714 3 − 4 8.5714 Buildin block matrix ng Tempor rary values are, = − 5.7143 =− 2 2.8571 = − 2.8571 = − 11.4286 = 8.5714 = 14 4.2857 = 8.57 714 = 14.2 2857 = − 22 2.8571 Tap changing transformer in line 1-2 1 = = − 2.222 0.45 . . = = − 2.1575, = . Temporary values are, = − 2.0947 = 2.1575 = 2.1575 = − 2.2222 ( . . ) = 0.0628, = . ( . . ) = − 0.0647 Line 1-4 with half line charging susceptance of j0.25 at each end = = − 3.3333, = 0.25, = 0.25 . The =− = = = =− = = =− = =− matrix is therefore, 3.3333 + 0.25 − 2.0947 = − 5.178 = 2.1575 =0 = 3.3333 2.2222 − 5.7143 = − 7.9365 = − 2.8571 = 8.5714 11.4286 = 14.2857 3.3333 + 0.25 − 22.8571 = −......

Words: 760 - Pages: 4

Watch movie | The Changing o season 24 episode 11 | ← Anterior